Well, here we go folks. The resin shipment came in last Friday.
I've been putting in about 4-6 hours a day on resin, but the weather
has not been kind here in New York. On Friday through Sunday it was
in the high eighties—basically cooking the interior of the tin
roofed resin workshop. We haven't been able to run the air
conditioning unit because of the cost, so we are having to work when
the temperatures are naturally cooler (Early morning – late at
night.). Essentially, the resin we use will boil when mixed at
temperatures above 80 degrees. Things are moving along a bit slower
than we would like in that department. From Wednesday to Friday the
temperatures outside have been too cold. Thursday night the
temperature was right at freezing. Again we can not run the electric
heaters, too expensive when we have no cash flow, so we must wait
until the temperature climbs in the workshop. (The resin will be
gummy and break like poorly baked cookies if the temperatures are
below 69 degrees.) But onto more positive news.
On the production side of things, concerning the mats, August is
nearly finished and we will be starting September soon. I believe
September will be a smaller month as far as orders went. On another
positive note, as listed on the ZUZZY store page, we can now send out
orders in these sizes—2X4FT. and smaller mats within our normally
stated time frame—probably sooner.
We have used half of the latex we received two weeks ago. Normally
we would order more at this time, but cash is tight so we will not be
doing this at this time. We'll see how the can bounces as we kick
that one down the road a bit.
On the shipping end of things. We have experienced a few bumps in
the road. We are trying to resolve those problems. So, June and July
customers, if you haven't received your packages yet, don't panic,
they will be on your doorsteps soon.
Also, at the beginning of this upcoming week we will start paying
back the customers which wanted refunds that fell outside of Paypal's
charge back policy—starting with June. We will be contacting each
of you in email and then be sending a check in the mail. This, also,
will be a slower process than any of us would like.
And, a few of you have asked for pictures. Jim and I are still
discussing this and perhaps in future posts we will put up a few to
go along with the updates.
The battle continues . . .
Best Always,
Kevin and Jim
Miniature Wargame, RPG & Model Building Links and News From ZUZZY Miniatures
Saturday, May 16, 2015
Wednesday, May 6, 2015
Mid-Week Update
On the production end of things: June is finished for the most
part. All that is left is prep and packaging for a few stragglers.
July was started on Monday, as far as production goes. The mats are also mostly finished. Again, they will be waiting on prep and packaging.
An aside note: Preparation involves cleaning, cutting, and trimming the mats. This process can take some time. We don't use any machinery to do this. In fact the only one that can do this process is Jim. The man has the hands of a surgeon—or perhaps even better. Each mat that you receive has been hand trimmed by him. I have never met anyone else that can do what he does. (It is impossible for me to do, due to an illness from childhood that left me with shaking hands.) After the prep they are packaged and sent to the shipping department, where I box them up.
Back to our update:
Most of July should be ready to go out by the end of the week and the beginning of next. August production will be in full swing by the weekend. As I recall August is a fairly large month. It most likely will not be as quick a turn around as June and July. They had mostly been finished when all hell broke loose back in November. September through December purchases dropped four fold, so production on these months should also be relatively quick. But I will revisit this in the days to come.
To get this far we have used one quarter of the order of latex that arrived last Friday.
I should be giving you another update at the end of the week.
Thanks again for your patience.
Best Always,
Kevin and Jim
July was started on Monday, as far as production goes. The mats are also mostly finished. Again, they will be waiting on prep and packaging.
An aside note: Preparation involves cleaning, cutting, and trimming the mats. This process can take some time. We don't use any machinery to do this. In fact the only one that can do this process is Jim. The man has the hands of a surgeon—or perhaps even better. Each mat that you receive has been hand trimmed by him. I have never met anyone else that can do what he does. (It is impossible for me to do, due to an illness from childhood that left me with shaking hands.) After the prep they are packaged and sent to the shipping department, where I box them up.
Back to our update:
Most of July should be ready to go out by the end of the week and the beginning of next. August production will be in full swing by the weekend. As I recall August is a fairly large month. It most likely will not be as quick a turn around as June and July. They had mostly been finished when all hell broke loose back in November. September through December purchases dropped four fold, so production on these months should also be relatively quick. But I will revisit this in the days to come.
To get this far we have used one quarter of the order of latex that arrived last Friday.
I should be giving you another update at the end of the week.
Thanks again for your patience.
Best Always,
Kevin and Jim
Subscribe to:
Posts (Atom)
Popular Posts
-
We have just launched the all new ZUZZY forum (edit: 9/21/10 Edited this link to point to our new forum, now located on our Facebook page)....
-
Here's a sneak peek at the upcoming Broken Blacktop Terra-Flex mat. The sculpt for it is complete and we will be able to start productio...
-
Greetings ZUZZY customers, gamers, crafters, general hobbyists. Thank you so much for allowing us to be a part of your hobby experience. It ...
-
We have been reminded by a few of you that we are a little late on our update. The month of May has passed and we are now far into June. The...
-
Here's a sneak peek at our newest battlemat that we're working on. It's the Feldston Paven mat. It's a rough fieldstone pave...
-
Facebook has announced that it is shutting down all of the fan page discussion forums on October 31st. They want people to focus on wall pos...
-
We have held off on making any price changes for years. And though the Post Office has raised their rates several times, they were moderate ...
-
Our Terra-Flex battlemats are now available in two new sizes, 2x3 ft. (61 x 92 cm) and 3x4ft. (92 x 122 cm). These new sizes are aimed at ...
-
Here are a few shout-outs to some blogs that are featuring ZUZZY battlemats. First blog post I've found featuring our new Broken Black...
-
DM Kaydon over on YouTube, as well as being a close friend of ours, is an avid roleplaying game terrain builder. And he now has his own YouT...